Cable Laying

Cable Laying

In order to avoid problems on your medium and low voltage systems, we can implement cable installations and connections of up to 36 kV
Regardless of whether the link should be implemented on medium voltage (MV) or low voltage (LV) systems or cable joints should be placed, we are your first point of contact in this field.

MV cable ends for internal installation with the push-on or shrink systems
MV connecting joints with screws
MV connecting joints with tension system
Repair of mass-impregnated cable ends
LV connection and branch joints (also ‘live working’)
LV connections with distributors and connecting cabinets (also ‘live working’)